The Strike has ended however there is a huge back log which may take up to two weeks to clear. Also note the rail link to Mundra is still under repair. 12th August noticeThe strike at GTI terminal continues with no resolution in sight. The gates remain closed. The other terminals – JNPT &…
The crisis in and around the port of Nhava Sheva has been deteriorating in the last few weeks. This is mainly due to the fact that the port is operating beyond its capacity. Adding to this, there has also been breakdowns in equipment and infrastructure. There is a severe congestion of…
Please be advised operations at the three terminals in Nhava Sheva Port have been disrupted recently due to a number of factors including, peak export volumes, an already over stretched infrastructure, aged equipment prone to breakdown and labor go slows/strikes. There are literally…